[пост на русском сразу под текстом на английском]
Finally got to the point when there won’t be any visible changes on a house building progress. Very excited about being close to a key hand-over date and a bit horrified by all the work which should happen straight after that – vacating the rental property, moving in and out, paving, flooring (have the ambitious plans to do it by myself!), swimming pool installation and hips of other things. Read the rest of this entry »